Overburden management in open pits options and limits in
· Limestone deposit is covered by a 50 70 m thick layer of soil clayey sand and clay which has to be removed by means of excavators/shovels and chain bucket excavator Material must then be disposed in a nearby exhausted multiple bench open pit partially flooded with groundwater level expected to raise in the next years see Fig 4 The designed …